SCOPE OF WORK TEMPLATE
A scope of work your client cannot misread.
A scope of work lists what your studio will make, what it will not make, how many rounds of revisions are included and how the client accepts the work. Use this template, with web design, branding and video versions, before anyone opens a design file.
7 days · no card
One more change, in writing.
The client asks on the document. You answer and mark it resolved.
The template
Eight sections of a creative scope of work
A scope of work describes the work itself. Keep it to the facts a designer, an editor or a developer needs to know when to stop. Replace the brackets and keep the numbers specific.
-
The project in one paragraph
Name the client, the thing you are making and the reason it exists. One paragraph is enough. Everything below this line should trace back to it.
[Studio Name] will design and build a five-page marketing website for [Client Name] to support the launch of their new consulting service in [Month Year]. The site replaces the current one-page landing page.
-
Deliverables, with quantities and formats
List every asset as a line with a number next to it. Write the file formats and sizes. If a deliverable is not on this list, it is not in the project.
Deliverables: (a) one sitemap and wireframes for 5 pages; (b) high-fidelity designs for 5 pages at desktop and mobile widths, in Figma; (c) the built site on [Platform], with a contact form; (d) one 30-minute recorded handover walkthrough.
-
Phases and what each one produces
Break the work into phases and say what the client receives at the end of each one. Phases give both sides a clear moment to review and approve before the next step starts.
Phase 1, Discovery: one kickoff call and a written direction summary. Phase 2, Design: homepage design, then the four inner pages once the homepage is approved. Phase 3, Build: development, browser testing and launch on the client domain.
-
Exclusions
Write down the things clients often assume are included. This is the section that answers "is that included" before anyone has to ask it in week four.
Not included: copywriting, photography or stock image licenses, logo or brand changes, blog setup, SEO beyond basic page titles and descriptions, paid plugins, hosting fees, and ongoing maintenance after launch. Any of these can be quoted separately.
-
Revision rounds, and what counts as one
State how many rounds are included at each phase and define a round. A round is one set of consolidated written feedback from one person, answered by one updated version.
Each phase includes two rounds of revisions. A round is one consolidated list of written feedback from [Client Lead], sent within five business days of delivery. A change to an approved phase, or a third round, is billed at [hourly rate] after written approval.
-
Client inputs and dependencies
List what the client must hand over and by when. Tie your dates to those inputs so a late folder of photos moves the schedule, not your evenings.
[Client Name] will provide final page copy, logo files, brand colors and website access before Phase 2 begins. If inputs arrive late, delivery dates move by the same number of business days.
-
Acceptance criteria and sign-off
Say what done looks like and how the client confirms it. Without an acceptance rule, a project can stay ninety percent finished for months while the final invoice waits.
A phase is accepted when [Client Lead] approves it in writing, or five business days after delivery if no written feedback is received. The project is complete when the site is live on the client domain and the handover walkthrough is delivered.
-
How changes are handled
Describe the path for new requests. A short change process keeps the relationship friendly because nobody has to argue about whether a request is fair.
Requests outside this scope will be written up as a change request with the added cost and the effect on the schedule. Work on a change starts only after [Client Lead] approves it in writing.
Scope vs SOW
Scope of work or statement of work
| Question | Scope of work | Statement of work |
|---|---|---|
| What it covers | The work itself: deliverables, phases, exclusions, revisions, acceptance | The whole engagement: the scope plus fees, payment schedule, ownership and legal terms |
| Who reads it most | Your team and the client lead, during the project | The client decision maker and sometimes their legal or finance team, before signing |
| When you write it | After the proposal is accepted, before kickoff | At the same time, as the document the client signs |
| Typical length | One to two pages | Two to six pages |
| Fees and payment terms | No, or only a reference to the agreement | Yes, with milestones and due dates |
| Copyright and ownership | No | Yes, usually transferred on final payment |
| Can it stand alone | Yes, as an appendix to a contract or master agreement | Yes, it is the contract for the project |
Many small studios put the scope of work inside the statement of work. If you need the full contract-level document, use the statement of work template.
Trade versions
Scope of work examples for web, branding and video
The structure stays the same across trades. What changes is the list of deliverables and the exclusions clients assume. Paste the version that matches your studio into sections 2 and 4.
-
Web design: deliverables
Name the page count, the breakpoints, the platform and the handover. Web projects drift through extra pages and extra templates, so count both.
Design and build of up to 6 unique page templates on [Webflow or WordPress], responsive at desktop, tablet and mobile widths. Includes a contact form, basic on-page SEO fields, a 404 page, launch on the client domain, and a 30-minute CMS training call.
-
Web design: exclusions
List integrations and ongoing work by name. Clients rarely ask for a store in the first meeting, then ask for one in week three.
Excludes e-commerce, membership or booking integrations, copywriting, blog migration of more than 10 posts, accessibility audits, hosting and domain fees, and support after the 30-day launch window.
-
Branding: deliverables
Count concepts, not just final files. The number of initial directions is the line clients push on most in identity work.
Two initial logo directions, one refined into a final primary logo with a secondary mark and a favicon. A color palette, a type pairing, and a 12-page brand guidelines PDF. Final files in SVG, PNG and PDF, in full color, one color and reversed.
-
Branding: exclusions
Separate the identity from everything it later gets applied to. Applications are a separate project.
Excludes naming, trademark searches, commercial font licenses, packaging, signage, stationery printing, social media templates and website design. Additional concept directions are billed at [fee] each.
-
Video production: deliverables
Write runtimes, cutdowns, aspect ratios and the number of shoot days. Video scope is measured in days on set and minutes on screen.
One 90-second brand film, plus three 15-second cutdowns in 9:16 and 1:1. Includes one pre-production call, a shot list, one shoot day of up to 10 hours with a crew of three, editing, color grading, licensed music and burned-in captions.
-
Video production: exclusions
Name the costs that change with the shoot. Locations, talent and travel are where video budgets break.
Excludes talent fees, location fees and permits, travel outside [City], additional shoot days, motion graphics beyond titles and lower thirds, and raw footage delivery. A second edit direction after picture lock counts as a change request.
Mistakes
Five scope of work mistakes that cost studios money
- Writing "website design" instead of "design of 6 page templates" turns every new page idea into a free extra.
- Leaving out an acceptance rule lets a finished project stay open for months while the final invoice waits.
- Counting revision rounds without defining a round lets scattered emails from four people count as one round.
- Skipping exclusions because the client "seems reasonable" leaves the studio to argue scope later with no written reference.
- Keeping the scope in an email thread means half the team works from the old version.
How to use it
From accepted proposal to signed scope
Write the scope after the client says yes to the proposal and before the kickoff call.
-
Copy the deliverables from the accepted proposal.
Turn every line the client agreed to into a numbered deliverable with a quantity and a format. Do not add new items here; that is how scope quietly grows.
-
Paste your trade version and edit the exclusions.
Start from the web, branding or video example above. Add any exclusion that came up in the sales conversation, such as copy, photography or extra pages.
-
Set rounds, inputs and the acceptance rule.
Write the number of rounds per phase, the client inputs with dates, and how a phase is accepted. These three lines settle most disputes before they start.
-
Get it signed with the agreement.
Attach the scope to your statement of work or contract and send both for e-signature in one link. Book the kickoff only after the signature comes back.
In Waco3
Keep the signed scope where the work happens
Waco3 does not ship this exact scope of work as a ready-made file. You write it once in your brand and reuse it.
-
Write it in your studio brand.
Build the scope in the document editor with your logo, colors and type. Save your web, branding or video version as a template so the next scope starts from your own wording. See templates.
-
Signed in the same link.
Send the scope for e-signature with delivery tracking, an audit trail and a certificate of completion. The client signs on a phone with nothing to install. See e-signature.
-
One more change, in writing.
The client can ask for a change directly on the shared document. You answer it there and mark it resolved, so the request and your reply sit next to the scope instead of in an inbox.
-
Show the scope inside the client portal (beta).
Put the signed scope in a private client portal next to the project plan, files and to-dos. Client Portals are in beta and included in Pro and Studio. See the client portal.
Questions
Questions
What is a scope of work?
A scope of work is the part of a project agreement that describes the work itself: the deliverables, the phases, what is excluded, how many revisions are included and how the client accepts the result. It tells your team when the job is done.
What is the difference between a scope of work and a statement of work?
A scope of work covers only the work. A statement of work is the full project document: it contains the scope plus fees, the payment schedule, ownership and legal terms. Small studios often place the scope inside the statement of work.
What should be included in a scope of work?
At minimum: a one-paragraph project summary, numbered deliverables with formats, phases, exclusions, revision rounds with a definition of a round, client inputs with dates, an acceptance rule and a process for change requests.
How detailed should a scope of work be for a design project?
Detailed enough that someone outside the project could count the deliverables. Write "6 page templates at three breakpoints" rather than "website design". One to two pages is usually enough for a studio project.
Who writes the scope of work, the studio or the client?
For creative projects the studio usually writes it, because the studio knows what the work involves. The client reviews it, asks questions and signs. Writing it yourself also means the exclusions are worded your way.
How do I handle requests outside the scope of work?
Point to the signed scope, confirm the request is new, and send a short change request with the added cost and the new dates. Start the extra work only after the client approves it in writing.
Is this scope of work template legal advice?
No. It is operational guidance and sample wording for creative studios. Contract rules differ by country and state, so have a qualified lawyer review the agreement your scope is attached to.